Technical Assistance

Platinum Pacific Australia ( PPA) provides supply chain advice, project scheme proposals and assessments to allow teams to maximise current product and technology in the market. For builders, developers, architects and specifiers considering the benefits of modular building or using Bathroom Pods, PPA consults to provide insights, technical expertise and material recommendation.

Case study: Government  Building
PPA provided technical assessment and tender reviews for the application of prefabricated elements into an infrastructure project in NSW. Working with contractors to highlight world-wide product availability, PPA recommended techniques and the possible application of suitable elements into the project design brief. PPA technical assistants offers expertise and experience to inform and review the assessments allowing contractors to develop technical solutions that reduced costly track based operations substituted with off-site construction elements.

Independent Project Assessments

PPA Provide clients and contractors with independent advice and assistance with prefabricated applications at feasibility, tender or delivery stage. Providing company-wide assessments of the application of modern methods of construction. Assisting teams to highlight product and supplier capability with regards to the procurement of prefabricated building elements.

Case Study: Residential Development using Bathroom Pods

To assist a major developer builder in the low rise multi-family sector an assessment of the current design of wet areas was conducted with a view to offering more efficiency over a large number of units. The result was a considerable saving in wet area types allowing procurement savings over the whole business and allowing the efficient application of prefabricated products and technology

PPA Consults in technical advice for new modern methods of constructions using Bathroom Pods and modular building techniques to deliver upto:
25% cost savings across the project
Time efficient delivery to installation
Reduced construction effects too neighbouring areas
Energy saving, efficient building methods
Cost management opportunities, scheduling and material choice
Precise manufacturing, German precision

Find our more about PPA Consulting contact us below.